We hold four ASME stamps, ISO 9001 certification, and operate to API, TEMA, EJMA, and B31.x standards. This page lays out the dossier in full.
Manufacturing Data Report
Our Certifications
We are corrnnited to mamiaining the inghest sfandards in gutal responsibility through intemationally reseanized dernfirications.alty: safely, and environmen
Our ISO 9001 QMS aligns with the audited requirements of our ASME Authorized Inspection Agency. Every product moves through a documented procedure from RFQ to delivery.
RFQ
01
Design Review
02
Material Procurement
03
WPS / PQR Qualification
04
Fabrication
05
NDE
06
PWHT
07
Hydrotest
08
MDR
09
Dispatch
10
Approval gate
Hold point
Deliverable
Third-Party Inspection
The shop is set up for continuous TPI.
Hold-point and witness-point management is built into our ITP. Inspectors from any of the agencies below are accommodated as a standard part of the production schedule.
ISO 9001:2015
Quality Management System
ISO 9001:2015
Quality Management System
ISO 9001:2015
Quality Management System
ISO 9001:2015
Quality Management System
ISO 9001:2015
Quality Management System
ISO 9001:2015
Quality Management System
Non-Destructive Examination
In-house NDE across eight methods.
NDE Method
Code
Capability
Personnel
Radiography (RT)
ASME V Art. 2
Film + digital
ASNT Level II Certified Personnel
Ultrasonic (UT)
ASME V Art. 4
Conventional + PAUT + TOFD
ISO Audit Certificates
Magnetic Particle (MT)
ASME V Art. 7
Wet + dry
ASNT Level II
Liquid Penetrant (PT)
ASME V Art. 6
Color + fluorescent
ASNT Level II
Hardness Testing
NACE MR0175
Brinell + Vickers
ASNT Level II
Helium Leak
ASME V Art. 10
Mass spectrometer
ASNT Level II
Positive Material ID
ASTM E1476
XRF + OES
Qualified technician
Hydrostatic Test
ASME VIII / API 650
Up to 100 barg
TPI witnessed
Welding Qualification
Procedures qualified across five material families.
We maintain over 200 qualified WPS / PQR combinations covering carbon steel, low-alloy steel, stainless steel, duplex, and nickel alloys.
WPS COUNT
0+
PQR COUNT
0+
WELDER QUALIFIED
0+
RE-QUALIFICATION CADENCE
06 mo
Manufacturing Data Report
What every MDR contains.
A complete dossier ships with every vessel. Compiled in the client’s template, cross-referenced to the weld map and signed by the TPI.